Description
A technical study proposing 3 miles of Interstate 5 in Seattle be rerouted into a deep-bore tunnel. This will simultaneously enhance the highway's throughput, relink a divided downtown and restore 100 acres of land to the City's inventory.
Details
Author: |
Cheval Tepier |
ISBN 10: |
0578494108 |
Pages: |
160 |
Publisher: |
Integrate-5 |
Publication Date: |
April 30, 2019 |
Binding: |
Paperback |
Weight: |
0.90lbs |